We have gained the total contract of Shanghai maglev railway project of inland transportation of imported device , that is
to say , from yard to the building site unloaded to the ground. In the imported oversized devices, arteries and carriages are
high valued and are strict in the process of transportation , 15 maglev carriages made in terms of the standard aircraft, has reached an unprecedented extent of transporting requirement. We have carefully worked out and arranged the scheme of the transportation and successfully accomplished the task in the October of 2003 , and set up a record of volume for 33178
tons, 2252TEU , value for 900 million US Dollars with out a mistake and got high praises from the headquarter of Shanghai Maglev bureau for our excellent service. |
| |
Dec. 2007,Entire-transport five sets of boilers for Shoustell Jing-Tangsteel United Co. ,Ltd |
| |
Nov. 2007,we transport oil and chemical equipments co-exported by WU Xi HUA LI Petrochemical construction Company and Zhi Cheng Sheng Petrochemical Equipment Company. Loaded from factory in Wuxi ,and transported by waterway and Road at same time to Shanghai Port for shipment and export. Totally, 77 sets of equipments , 3213m3 ,406 t in weight, with biggest cargos of 17*6.3* 6.4m ,101 t |
| |
Oct.2007 ,Win bids of Belize 31.5MW power plant project |
| |
Aug.2007,we transport six sets of energy--saving boilers for OECHATZ Energy and Enviroment Equipments ( Nanjing )Co. ,Ltd. From 1st Aug. to the end of Dec. Transported six sets of boilers within four batches. The operation process was: Road-transportaion from Nanjin to Port-----Unloaded from turck and shipment at Nanjing Long Tan Port------A rrived at Shanghai by waterway-----Trans-shipment on vessel at Shanghai Gong Qing Terminal ------Seaway-----Unloaded and handling at Da Lian Port or Baryuquan Terminal------Road Transported and delivered at panel-truck of the factory yard. |
| |
May.2007,Mega-vessel reached Shanghai Port No.10 with cargos exporting from Europe (clinker and slag grinding components, 118.94 tons, 142.5m3 ). After port haulage and customs declaration, the cargos was transported to Wuhan Port by waterway and unloaded to truck,and arrive at Hubei Ya Dong cement factory yard. The major part weights 107t ,and was savely delivered at truck-panel of the factory on May 17th |
| |
Jan. ~Mar. 2007 transportation wind-tower equipments(total 100 pieces) for Fujian wind power station project |
| |
In March of 2006, We shipped three towers from Jinshan manufactory to our Gongqing Port by using the vehicle board with the cargo unloaded to the ship with each includes 15 devices , totally 45 devices in 1800 tons of wind power plant in Fujian Dongshan island. |
| |
Mar. 2006 Transport three segments of wind-tower(with each 15 pieces) for Dujian Eastmountain Island Wind Power Sataion,totally 45equipments of 1800 tons,and picking-up from Shanghai Jinshan factory to SIPGL's Gong Qing Terminal for shipment. Our company was responsible for transfer handling in Shanghai Port and completed it within 14 voyages. Gong Qing Terminal used two 40-ton cranes to doubole-raise the wind-tower( 29m in length,69 tons) |
| |
In September 2005, we took charge of Shanghai key engineering project---the transportation of Mid Ring Road box girder |
| |
In September of 2005, we made a new breakthrough in transportation of heavy-lift and oversized cargos in the long way, which is the transportation of girder of ‘T” shape and central circle highway trunk.Thereinto, the trunk girder weights 140
tons and its length is 30 meters, the “T” shape girder weights 90 tons with its length for 39 meters. |
| |
In August 2005, we successfully operated the loading and transportation of the key equipments of world largest gasification project---coal-to-gas vaporizing stove |
| |
In November of 2004 , we signed the contract with “SECCO” for highway solid cargo transportation . It indicates
that SIPGL have marked a delightful step to the direction of specialized and featured logistics development. “SECCO”have a general investment of 2.7 billion US Dollars , which is one of the biggest joint venture invested by mainland and overseas in
oil and chemistry project . Its annual production of polyethylene, polypropylene and polystyrene are stand up to 900 tons,
the countrywide logistics site for dispatching its solid product has 58 to 88 . After undertaking this project, we are in charge
of the logistics service of “SECCO” solid product . In March of 2005 , it came into existence. |
| |
In 2004, we undertook the loading and transportation project of ‘ F1 Motorboat Race 2004 ' successfully |
| |
From December 2003 to June 2004, acted as an agent of MAMMOET (Netherland) for import 7 heavy-lifts |
| |
In December 2003, we won the transportation project YAR - ACO of BP (Sichuan) Corporation, in which, the most heaviest-lift is 136 tons |
| |
In 2003, we won the transportation contract for Air Liquefaction ( Hangzhou ) Co., Ltd. China , in which, the most heaviest-lift reached 112 tons and 33 m in length |
| |
In 2001, we won the contract of loading the import equipments for APEC Conference Center and the terminal building of Pudong Airport |
| |
In 2001, successfully won the chief carrier company of the whole process of inland transportation for the Shanghai Magnetism Track project equipments |
| |
In 1999, acquired the agency status for imported Yangtze River Gorge Power Plant equipments in sets and 8 years imported containers transshipment contract |